MEDICAL

St. Vincent Hospital – IH Billings

Design-assist steel detailing for a 14-story hospital with extensive multitrade coordination.

LocationBillings, Montana
Client and FabricatorTrueNorth Steel
Structural and Miscellaneous SteelApproximately 4,029 tons
Building Height14 stories
Delivery MethodDesign Assist

Project overview

A major vertical healthcare project in Billings.

The St. Vincent Hospital – IH Billings project involved the development of a 14-story healthcare facility in Billings, Montana.

Working for TrueNorth Steel, Anatomic provided design-assist services and detailing for approximately 4,029 tons of structural and miscellaneous steel.

The scope extended beyond the primary structural frame to include elevator framing, roof openings, a sky bridge, extensive stair towers and miscellaneous metals.

Time-stamped erection visualization of the St. Vincent Hospital steel frame in Billings, Montana Approx. 4,029 Tons detailed Enlarge view
Time-stamped erection visualization of the St. Vincent Hospital steel frame in Billings, Montana
Project team and technical details
Engineer of Record
Martin/Martin
Primary Scope
Structural steel and miscellaneous metals detailing
Special Structural Elements
Elevator framing, roof openings and sky bridge
Miscellaneous Metals
Stairs, guardrails, ladders and related components
Delivery Approach
Design Assist with regular model submissions to the Engineer of Record

Steel detailing scope

From the main structural frame to specialized steel elements.

01

Primary structural frame

Detailing of wide-flange beams, columns, braces, HSS members and embedded steel components across the 14-story structure.

02

Specialized structural elements

Elevator framing, roof openings and the sky bridge introduced additional conditions beyond the main structural frame.

03

Stair towers and miscellaneous metals

The scope also included extensive stair towers, stairs, guardrails, ladders and related steel components throughout the building.

Design assist & coordination

A developing model coordinated with engineering and multiple trades.

Engineering review

Regular model submissions to Martin/Martin, the Engineer of Record, supported coordination as the structural design developed.

Multitrade coordinationThe model was coordinated with precast, metal deck, elevator, stud wall panel, building shell and penetration trades.

Project animation

Explore the structural model in motion.