Structural steel detailing for a new learning environment.

Orchard Mesa Middle School is an approximately 100,000-square-foot educational facility in Grand Junction, Colorado.

Working for WSI, Anatomic provided detailing for approximately 605 tons of structural steel, including distinctive branching HSS columns and large built-up trusses spanning the school’s central common area.

The complex geometry required close BIM coordination with the design team, while an aggressive project schedule called for a fast and reliable process for resolving detailing questions.

Structural steel frame during construction at Orchard Mesa Middle School 605 Tons detailed Enlarge view
Structural steel frame during construction at Orchard Mesa Middle School
Project team and technical details
Project
Orchard Mesa Middle School
Location
Grand Junction, Colorado, USA
Client / Fabricator
WSI
Owner
Mesa County Valley School District 51
Structural Steel
605 tons
Project Period
2018–2019
Architect
Blythe Group + co.
General Contractor
FCI Constructors, Inc.
Key Steel Elements
Branching HSS tree columns and built-up trusses

Model to field

From coordinated geometry to the project on site.

Orchard Mesa Middle School structural model01/ Detailed Model
3D detailing of the branching HSS columns and their connections to the roof framing.
Open atrium steel frame at Orchard Mesa Middle School during construction.02/ Built Structure
The branching steel assemblies taking shape during construction.

TECHNICAL COMPLEXITY

Turning branching HSS geometry into fabrication-ready information.

01

Branching geometry in three dimensions

The tree columns consisted of round HSS members branching in multiple directions to support the roof framing. Their geometry required accurate modeling of member intersections and connection locations.

02

Tree columns and built-up trusses

The branching columns connected with roof beams and large built-up trusses spanning the school's common area, requiring coordinated detailing of complex structural interfaces.

03

Fast answers within an aggressive schedule

The project's demanding schedule required a responsive coordination process to resolve design and detailing questions without delaying model development.

OUR APPROACH

Complex geometry reviewed directly with the design team.

3D modeling and BIM coordination

The branching HSS assemblies and surrounding framing were developed in a coordinated 3D model. Model-based reviews allowed the team to examine complex geometry and resolve questions with the design team as detailing progressed.

Live question tracking

Anatomic established a shared Google Sheets-based system for RFIs and project questions. Multiple participants could review and update the same information simultaneously, with questions typically answered within one or two days — and sometimes in real time.

Regular coordination meetings

Biweekly meetings brought together Anatomic, WSI, the general contractor and the design team. The shared question log kept unresolved issues visible and helped the team obtain timely decisions throughout the project.

Project animation

Explore the project in motion.