Three-month delivery
The project required both structural design documentation and steel detailing to be completed within an accelerated timeframe.
INDUSTRIAL
From design assist to fabrication-ready drawings in three months.
Project overview
Working closely with Martin/Martin, Anatomic prepared structural design drawings under the Engineer of Record’s supervision, followed by the complete fabrication and erection drawing packages.
The Design Assist approach allowed engineering decisions and detailing requirements to be coordinated throughout the project rather than handled as separate, sequential phases.
Both design assist and detailing for approximately 523 tons of steel were completed in around three months.
Approx. 523
Tons detailed
Enlarge view
Technical complexity
The project required both structural design documentation and steel detailing to be completed within an accelerated timeframe.
Working side by side with Martin/Martin allowed engineering direction to be incorporated into the developing steel model.
The same coordinated workflow carried information from design development into fabrication and erection drawings, minimizing the separation between project phases.