EDUCATION

Ector County MS

1,473 tons of structural steel detailing for a modern middle school.

LocationEctor County, Texas, USA
Client / FabricatorTrueNorth Steel
Structural Steel1,473 tons

Project overview

A large-scale steel structure supporting flexible education.

Ector County ISD New Middle School is a two-story educational facility spanning more than 18,000 m² (approximately 194,000 sq. ft.), designed to accommodate around 1,000 students.

The building combines classrooms, flexible instructional spaces, common areas, athletic facilities and administrative functions. Its steel framing supports long spans, open interior layouts and curved architectural elements.

Working with TrueNorth Steel, Anatomic detailed approximately 1,473 tons of structural steel using Tekla Structures, coordinating complex framing geometry and fabrication information across the building.

Overall structural steel model for Ector County MS 1,473 Tons detailed Enlarge view
Overall structural steel model for Ector County MS
Project team and technical details
Project
Ector County ISD New Middle School
Location
Ector County, Texas, USA
Client / Fabricator
TrueNorth Steel
Structural Steel
1,473 tons
Year
2025
Engineer
Kubala Engineers
Architect
PBK Architects, Inc.
General Contractor
Teinert Construction
Detailing software
Tekla Structures

TECHNICAL COMPLEXITY

Coordination and detailing challenges.

01

Curved steel at the building envelope

Steel framing associated with curved façade elements required accurate modeling of geometry and connections at architectural interfaces.

02

Long spans and varied framing layouts

Open educational and athletic spaces required precise detailing across different structural framing conditions.

03

Steel interfaces with MEP systems

Coordination with mechanical, electrical and plumbing systems helped identify potential conflicts before fabrication and installation.

OUR APPROACH

From model coordination to fabrication information.

Using Tekla Structures, Anatomic developed a detailed 3D steel model to coordinate member geometry, connections and interfaces with other building systems.

The model supported clash detection, prefabrication planning and the preparation of fabrication information for TrueNorth Steel.

This coordinated workflow helped reduce potential execution errors and supported more efficient assembly of steel components.