EDUCATION

Eisenhower High School

2,100 tons of structural steel detailing across nine complex building areas.

LocationYakima, Washington, USA
Client / FabricatorAllied Steel
Structural Steel2,100 tons
Project Year2013

Project overview

Structural steel detailing for one of Washington's largest high schools.

Eisenhower High School in Yakima, Washington, is a large educational facility comprising approximately 333,000 square feet across nine principal building areas.

The school includes two major classroom wings, a performing arts theater with an overhead catwalk, a full gymnasium and two elevated pedestrian bridges connecting the wings.

Working for Allied Steel, Anatomic provided detailing for approximately 2,100 tons of structural steel. The scope combined complex architectural geometry, specialized seismic bracing and extensive coordination throughout a continually evolving design.

Pedestrian bridge and steel framing during construction at Eisenhower High School 2,100 Tons detailed Enlarge view
Pedestrian bridge and steel framing during construction at Eisenhower High School
Project team and technical details
Project
Eisenhower High School
Location
Yakima, Washington, USA
Client / Fabricator
Allied Steel
Owner
Yakima School District No. 7
Structural Engineer
Kramer Gehlen & Associates
Architect
NAC Architecture with KDF Architecture
General Contractor
Graham Construction
Structural Steel
2,100 tons
Project Year
2013
Detailing Software
Tekla Structures

SCOPE OF WORK

A theater, gymnasium, classroom wings and connecting bridges.

The steel detailing package covered nine principal building areas, including:

  • A performing arts theater with an overhead catwalk.
  • A full gymnasium and associated long-span framing.
  • Two large classroom wings extending south from the main building.
  • A Level 2 north pedestrian bridge connecting the wings.
  • A multilevel south pedestrian bridge.
  • Extensive seismic framing, including heavy Yield Line braces.

The different structural systems required coordinated detailing across the building’s interconnected areas.

Model to field

From coordinated geometry to the project on site.

Overall structural steel model for Eisenhower High SchoolDetailed Model
Tekla modeling of complex framing, pedestrian bridges and changing structural geometry across the school.
Project photograph of Eisenhower High SchoolBuilt Structure
The erected steel structure, including major framing systems and elevated connections between building areas.

TECHNICAL COMPLEXITY

An evolving design generating hundreds of RFIs.

01

A curved and leaning wall

Along Gridline RA, the west wall of the east classroom wing curved continuously while leaning inward at an increasing angle. This required precise three-dimensional definition of the changing framing geometry.

02

Specialized seismic framing

A high concentration of heavy Yield Line seismic braces introduced complex connection and coordination conditions throughout the structure.

03

Incomplete and evolving design

Unresolved design conditions, conflicts and missing information generated hundreds of RFIs, while frequent revision bulletins required continuous updates to the detailing model.

04

Model-based information control

Tekla User-Defined Attributes linked RFIs, extra-work claims, held steel and submittal status to affected steel components, helping the team manage changes across the project.

OUR APPROACH

One model connecting geometry, revisions and project decisions.

Model-based coordination and tracking

Anatomic used Tekla Structures to coordinate with other trades and manage project information directly within the steel model. User-Defined Attributes helped track outstanding RFIs, held material, extra work and drawing submittals against the affected components.

Connection macros and custom components

Tekla connection macros and custom components reduced repetitive modeling work and supported consistency as connection conditions evolved.

Weekly live model reviews

Anatomic hosted weekly online RFI and model-review meetings with the general contractor, design team and fabricator. Reviewing the live Tekla model allowed participants to examine design conflicts in 3D, clarify difficult conditions and work toward timely resolutions.

Project animation

Explore the project in motion.