Infrastructure & Transportation

Norwegian Cruise Line Terminal B

Structural steel detailing for a landmark cruise terminal at PortMiami.

LocationMiami, Florida, USA
Client / FabricatorHaskell Steel
Structural SteelApproximately 7,700 tons
Building AreaApproximately 166,500 sq ft
Passenger CapacityUp to 5,000 passengers
Completion2019

Project overview

A large-scale, state-of-the-art cruise facility at PortMiami.

Norwegian Cruise Line Terminal B was designed to accommodate large cruise ships and support efficient passenger movement through embarkation, security screening and luggage handling.

Spanning approximately 166,500 square feet, the terminal combines a distinctive architectural form with complex structural systems. Its facilities include dedicated passenger lounges, service areas and direct access to parking.

Working with Haskell Steel, Anatomic provided full structural steel detailing for approximately 7,700 tons of steel. The project required close coordination between the structural framework, architectural features and operational systems.

Curved glass facade and sculptural roof shell of Norwegian Cruise Line Terminal B at PortMiami during construction. Approx. 7,700 Tons detailed Enlarge view
Curved glass facade and sculptural roof shell of Norwegian Cruise Line Terminal B at PortMiami during construction.

Scope of work

Full steel detailing in accordance with the AISC Code of Standard Practice.

Anatomic’s scope covered the development of a coordinated structural steel model and the detailing information required for fabrication and erection.
01

Coordinated 3D Tekla model

Development and maintenance of a detailed model incorporating the terminal’s structural steel systems.

02

Structural and miscellaneous steel

Detailing of primary and secondary framing, together with miscellaneous steel components.

03

Shop drawings

Preparation of fabrication documentation for structural and miscellaneous steel.

04

Connections

Detailing of bolted and welded connections, including bolts, anchor rods and welds.

05

Project coordination

Alignment of steel detailing with architectural, structural and operational requirements.

06

Design updates

Continual model and drawing revisions as design information evolved.

Model & construction

From coordinated steel model to on-site construction.

The project’s complex steel framework was developed in Tekla Structures, allowing the detailing team to work across the terminal’s extensive structural systems.

Model views and construction photographs illustrate how the steel geometry progressed from digital detailing to the built structure.

Overall structural model of Norwegian Cruise Line Terminal B showing the long terminal volume and curved end framing.01 / Coordinated model
Overall structural model of Norwegian Cruise Line Terminal B showing the long terminal volume and curved end framing.
Elevated overall view of Norwegian Cruise Line Terminal B with curved steel framing exposed during construction.02 / Fabrication & field
Elevated overall view of Norwegian Cruise Line Terminal B with curved steel framing exposed during construction.

Engineering & detailing challenges

Engineering and detailing challenges across a large-scale, evolving structure.

Scale

The substantial steel tonnage and building footprint required careful management of model information and detailing sequences.

Systems

Structural steel had to be coordinated with architectural features, building services and terminal operations.

Evolution

Frequent design changes required ongoing updates to steel geometry, connections and associated drawings.

Team

Coordination involved the architect, structural engineer, fabricator and contractor throughout the detailing process.

Geometry

The terminal’s distinctive architectural form and functional layouts introduced complex steel geometry and connection conditions.

Our approach

A model-driven and coordination-intensive workflow.

Tekla Structures provided the central modeling environment for managing the terminal’s extensive steel detailing scope.

Anatomic maintained close communication with the fabricator and other project stakeholders, reviewing changes, identifying potential conflicts and updating the model as design information developed.

This approach supported consistency between the structural model and fabrication documentation while allowing the team to respond to evolving project requirements.

Project film

Norwegian Cruise Line Terminal B on film.

Terminal construction
Erection animation

Project result

A coordinated steel model and drawing package for a landmark terminal.

Anatomic delivered the detailed steel model and fabrication documentation for the terminal’s approximately 7,700-ton structural steel package.

The completed detailing scope brought together complex structural geometry, connection information and evolving design requirements within a coordinated set of deliverables supporting fabrication and erection.

Read the Modern Steel Construction project feature